Projects and investment opportunities
Explore selected solar, battery storage and hybrid opportunities in Bulgaria. Public information is structured for quick initial screening; sensitive details are shared through a controlled process.

Operational PV 2 MW + BESS 2 MW / 7 MWh for sale
Operating solar plant with approximately 2 MWp installed capacity, two battery storage systems with around 7 MWh combined nameplate capacity and integrated PV and BESS control. The sale also includes an additional 7,484 m² property with potential for an EV charging hub and supporting infrastructure, positioned for access to high-traffic international road corridors. Offered for sale through a controlled process.

RTB solar PV project · 3.7 MWp
Solar PV project with 3.7 MWp installed capacity at Ready-to-Build (RTB) stage. Additional information will be added when available and shared through a controlled process.

RTB solar PV project · 150 kWp
RTB 150 kWp solar PV project with a construction permit, DAH Solar modules, mounting structure and external connection cable. The scope includes two Huawei inverters (50 kW and 100 kW), a specified 220 m excavation route, readiness for immediate grid connection and a house with a fenced 2,000 m² yard.

Utility-scale RTB solar project · 49.9 MW
Utility-scale solar project with a 49.9 MW grid connection, construction permits and 293 decares of seller-owned urbanised land. The implementation is structured in six stages and the opportunity is offered as an asset sale or a sale of shares in the project company at EUR 130,000/MW excluding VAT. Delivery of the ESO grid-node design remains pending.

Permitted solar PV project · 372 kW
372 kW solar PV project on a property with an approved detailed development plan for a photovoltaic plant and an effective construction permit. The grid connection agreement with ERP West is in progress, the required guarantee has been paid and the agreement is expected within approximately one month. Asking price: EUR 80,000.

Advanced-stage BESS project · 100 MWh
Advanced-stage standalone battery storage project with 100 MWh energy capacity. The project may be developed to Ready-to-Build (RTB) status within approximately six weeks. The land has been purchased and is owned by the project owner, and grid connection capacity is available. Further information is provided after signing an NDA and submitting an investment letter.
