Two adjacent solar PV projects · 4 MW AC / 4.38 MWp DC

Advanced-stage portfolio comprising two adjacent ground-mounted solar PV projects held in a single project SPV and offered together. Each project is designed for 2 MW AC / 2.19 MWp DC with 2 MW permitted grid export, providing a combined capacity of 4 MW AC / 4.38 MWp DC and 4 MW total export capacity. Effective building permits are in place for both PV plants, preliminary grid-connection agreements have been executed, and the application for the final connection agreement has been submitted. The projects will share a 20 kV underground connection of approximately 1.4 km to an existing substation, where a dedicated bay is reserved for them. The transaction includes the two regulated land plots, project rights and documentation. Dedicated areas for a future BESS configuration have been included, with an indicative capacity of 8–10 MWh subject to grid confirmation and the applicable permitting process.

Solar PVIn development

The image is for illustrative purposes and does not depict the actual project.

Opportunity overview

This page contains a structured public summary. Bulgarify reviews each enquiry before sharing additional documentation or facilitating direct contact.

Project profile

Technology
Solar PV
Capacity
4 MW AC / 4.38 MWp DC
Stage
In development
Controlled information process
Controlled access
Portfolio structure
Two adjacent projects held in a single project SPV
Combined capacity
4 MW AC / 4.38 MWp DC
Capacity per project
2 MW AC / 2.19 MWp DC
Permitted grid export
2 MW per project · 4 MW total
Development status
Advanced stage · effective building permits for both PV plants
Grid connection
Preliminary agreements in place · final agreement application submitted
Connection infrastructure
Shared 20 kV underground cable of approximately 1.4 km
Connection point
Existing substation · dedicated bay reserved for both projects
Land and permitting
Two adjacent regulated plots owned by the project SPV · environmental procedures completed
BESS potential
Dedicated areas included · indicative 8–10 MWh subject to grid and permitting approval
Transaction
Acquisition of 100% of the project SPV, including the projects, land, permits and connection rights

How access works

1