Advanced-stage standalone battery storage project with 10 MW power and 40 MWh energy capacity. The project is developed on a 12,850 m² urbanised industrial site owned by the project company, with direct asphalt-road access and almost flat terrain. An official grid-connection opinion and a preliminary connection agreement are in place, while the building permit is expected within approximately one month. An additional agreement enables the project company to carry out the required reconstruction of the relevant substation bays, supporting a faster implementation process. Further technical, commercial and documentary information is available through a controlled enquiry process.
The image is for illustrative purposes and does not depict the actual project.
Opportunity overview
This page contains a structured public summary. Bulgarify reviews each enquiry before sharing additional documentation or facilitating direct contact.
Project profile
- Technology
- Battery storage (BESS)
- Capacity
- 10 MW / 40 MWh
- Stage
- In development
- Controlled information process
- Controlled access
- Project configuration
- 10 MW / 40 MWh · 4-hour duration
- Development status
- Advanced development · building permit expected within approximately one month
- Grid connection
- Official connection opinion and preliminary agreement
- Connection infrastructure
- Approximately 1.5 km
- Grid works
- Additional agreement allows the project company to reconstruct the relevant substation bays
- Land
- 12,850 m² · owned by the project company
- Site status
- Urbanised territory · predominantly industrial zoning
- Access and terrain
- Direct asphalt-road access · almost flat terrain
How access works
Send a short enquiry and identify your interest.
Bulgarify reviews relevance and the required confidentiality level.
Approved parties receive the appropriate next step and available information.