Hybrid project · 19 MWp solar + 19 MW / 80 MWh BESS
Hybrid development opportunity in Bulgaria combining 19 MWp of ready-to-build solar PV with a planned 19 MW / 80 MWh battery energy storage system. The solar component has a valid building permit, and an ESO grid connection agreement and BESS addendum have been signed. Maximum combined export is 19 MW; the seller confirms battery charging from the grid at up to 19 MW independently of solar generation. BESS design and permitting remain to be completed, with the seller prepared to undertake this obligation in the transaction agreement. The proposed acquisition includes the project company, its land, project rights and existing permits. The project is not operational. This public overview is based on information provided by the seller; supporting documents are available through the controlled review process.
The image is for illustrative purposes and does not depict the actual project.
Opportunity overview
This page contains a structured public summary. Bulgarify reviews each enquiry before sharing additional documentation or facilitating direct contact.
Project profile
- Technology
- Hybrid PV + BESS
- Capacity
- 19 MWp PV / 80 MWh BESS
- Stage
- In development
- Controlled information process
- Controlled access
- Solar PV
- 19 MWp · Ready-to-Build · valid building permit
- Planned battery storage
- 19 MW power / 80 MWh storage capacity
- BESS permitting
- Design and building permit still to be completed
- Grid connection agreements
- Signed ESO connection agreement and BESS addendum
- Combined grid export
- Up to 19 MW for solar and BESS together
- Battery charging
- Grid charging up to 19 MW, independently of solar generation, according to the seller
- Land and transaction
- Acquisition of the project company, including its land, project rights and existing permits
- Seller's proposed commitment
- Completion of BESS design and permitting can be included in the transaction agreement
- Implementation
- Development project, not an operating asset; plant, battery and grid infrastructure construction remain to be completed
- Further information
- Supporting documentation after investor qualification, NDA and coordination with the seller
How access works
Send a short enquiry and identify your interest.
Bulgarify reviews relevance and the required confidentiality level.
Approved parties receive the appropriate next step and available information.
