Large-scale greenfield BESS project · up to 100 MW

Large-scale greenfield opportunity for the development of a standalone battery energy storage project on 38,000 m² of urbanized land. The project power can be configured up to 100 MW, while the storage capacity in MWh can be defined according to the investor's requirements. The concept includes a step-up substation and an indicative connection route of approximately 200 m along a municipal road. Following a preliminary agreement and confirmation of the investor's technical requirements, the project can be developed toward a building permit within an indicative period of 4–6 months. A letter of intent is required to proceed with the opportunity.

Battery storage (BESS)In development

The image is for illustrative purposes and does not depict the actual project.

Opportunity overview

This page contains a structured public summary. Bulgarify reviews each enquiry before sharing additional documentation or facilitating direct contact.

Project profile

Technology
Battery storage (BESS)
Capacity
Up to 100 MW / configurable MWh
Stage
In development
Controlled information process
Controlled access
Project power
Up to 100 MW
Storage capacity
Configured according to the investor's requirements
Development status
Greenfield
Project land
38,000 m² of urbanized land
Target building permit
Approximately 4–6 months after a preliminary investor agreement
Grid infrastructure
Planned step-up substation
Indicative connection route
Approximately 200 m along a municipal road
Investor process
Preliminary agreement and letter of intent

How access works

1

Send a short enquiry and identify your interest.

2

Bulgarify reviews relevance and the required confidentiality level.

3

Approved parties receive the appropriate next step and available information.