Large-scale greenfield BESS project · up to 100 MW
Large-scale greenfield opportunity for the development of a standalone battery energy storage project on 38,000 m² of urbanized land. The project power can be configured up to 100 MW, while the storage capacity in MWh can be defined according to the investor's requirements. The concept includes a step-up substation and an indicative connection route of approximately 200 m along a municipal road. Following a preliminary agreement and confirmation of the investor's technical requirements, the project can be developed toward a building permit within an indicative period of 4–6 months. A letter of intent is required to proceed with the opportunity.
The image is for illustrative purposes and does not depict the actual project.
Opportunity overview
This page contains a structured public summary. Bulgarify reviews each enquiry before sharing additional documentation or facilitating direct contact.
Project profile
- Technology
- Battery storage (BESS)
- Capacity
- Up to 100 MW / configurable MWh
- Stage
- In development
- Controlled information process
- Controlled access
- Project power
- Up to 100 MW
- Storage capacity
- Configured according to the investor's requirements
- Development status
- Greenfield
- Project land
- 38,000 m² of urbanized land
- Target building permit
- Approximately 4–6 months after a preliminary investor agreement
- Grid infrastructure
- Planned step-up substation
- Indicative connection route
- Approximately 200 m along a municipal road
- Investor process
- Preliminary agreement and letter of intent
How access works
Send a short enquiry and identify your interest.
Bulgarify reviews relevance and the required confidentiality level.
Approved parties receive the appropriate next step and available information.