Back to projects
Project opportunityPublic summary

10 MW / 40 MWh BESS project with a building permit

Standalone battery storage project with 10 MW power and 40 MWh energy capacity, an issued building permit and a 32,373 m² site owned by the project company. The property has direct asphalt-road access and almost flat terrain. An official grid-connection opinion and a preliminary connection agreement are in place. An additional agreement enables the project company to carry out the required reconstruction of the relevant substation bays, supporting a faster implementation process. Further technical, commercial and documentary information is available through a controlled enquiry process.

Battery storage (BESS)In development

The image is for illustrative purposes and does not depict the actual project.

Opportunity overview

This page contains a structured public summary. Bulgarify reviews each enquiry before sharing additional documentation or facilitating direct contact.

Project profile

Technology
Battery storage (BESS)
Capacity
10 MW / 40 MWh
Stage
In development
Controlled information process
Controlled access
Project configuration
10 MW / 40 MWh · 4-hour duration
Building permit
Issued
Grid connection
Official connection opinion and preliminary agreement
Connection infrastructure
Approximately 1.5 km
Grid works
Additional agreement allows the project company to reconstruct the relevant substation bays
Land
32,373 m² · owned by the project company
Land status
Agricultural land · ninth category
Access and terrain
Direct asphalt-road access · almost flat terrain

How access works

1

Send a short enquiry and identify your interest.

2

Bulgarify reviews relevance and the required confidentiality level.

3

Approved parties receive the appropriate next step and available information.