RTB 150 kWp solar PV project with a construction permit, DAH Solar modules, mounting structure and external connection cable. The scope includes two Huawei inverters (50 kW and 100 kW), a specified 220 m excavation route, readiness for immediate grid connection and a house with a fenced 2,000 m² yard.

Solar PVReady to build (RTB)
RTB solar PV project · 150 kWp
Controlled information process
150 kWp

The image is for illustrative purposes and does not depict the actual project.

Opportunity overview

This page contains a structured public summary. Bulgarify reviews each enquiry before sharing additional documentation or facilitating direct contact.

Project profile

Technology
Solar PV
Capacity
150 kWp
Stage
Ready to build (RTB)
Controlled information process
Controlled access
Solar modules
DAH Solar
Inverters
2 Huawei units · 50 kW + 100 kW
Construction permit
Issued
External connection route
220 m excavation route specified
Grid connection
Ready for immediate connection
Included property
House with a fenced 2,000 m² yard

How access works

1

Send a short enquiry and identify your interest.

2

Bulgarify reviews relevance and the required confidentiality level.

3

Approved parties receive the appropriate next step and available information.